Bathroom renovations
Bathroom renovations, done properly.
Bathrooms involve more trades per square metre than any room in the house. We plan the sequence, do the tiling ourselves and keep you dealing with one team.
Why one team matters
Fewer handovers. Fewer surprises.
When separate trades each do their piece, small gaps appear between them. We look after the whole sequence, so the waterproofing suits the tiling, the tiling suits the fixtures, and the paint goes on last.
- One team from demolition to final clean
- Tiling handled in-house, start to finish
- Clear sequence agreed before work begins
- Painting and making good included in the plan
- Work area protected and tidied each day
- Small ensuites through to main bathrooms
The renovation process
Six stages, in the right order.
- Stage 1
Talk and measure
We visit, measure up and listen to how you use the room: storage, shower or bath, who it is for.
- Stage 2
Plan and quote
A written quote setting out the scope, the sequence of trades and the selections you need to make.
- Stage 3
Strip-out
Old fixtures and tiles removed, floors and walls protected, waste taken away.
- Stage 4
Rough-in and waterproofing
Framing and substrate prepared, services coordinated, wet areas waterproofed before tiling.
- Stage 5
Tiling
Floors and walls set out from a planned centre line, with niches, falls and trims done carefully.
- Stage 6
Fit-off and clean
Vanity, screen, tapware and accessories fitted, paint finished and the room cleaned for use.
Bathroom gallery
Inspiration for your new bathroom.
These images show the kind of finish we work towards.




Free quote
Ready to plan your bathroom?
Tell us about the room and what you want from it. We will arrange a free measure and quote.